Update contents
- Arbor Editor
- Fix : Fixed that node shortcuts could be used while renaming nodes.
- Fix : When changing the order of ParameterContainer ‘s parameters, an exception that occurred when referring to that parameter was corrected.
Asset Store
Update procedure
Please follow the procedure below when updating Arbor.
- Please be sure to make a backup of the project before the update.
- If you are opening an existing scene, create a new scene from “File / New Scene” in the menu.
- Already Removed Arbor folder that have been imported.
- Import a new version of Arbor.